PAKISTAN SPORTS BOARD


EXPRESSION OF INTEREST

1.      Covering to a Practice Pool measuring 50.000 M x 21.000 M was provided in 1996. Steel truss structure was provided, cladded with woodcep duly covered with CGI sheeting and fiber domes in the middle. Exact size of roof covering (flat area) is 200'-9" x 100'-9" which also includes deck area around pool. Facia has also been provided. By the passage of time, woodcep material is deteriorated and rusting factor has started appearing due to condensation and effects of chlorination. It would be appreciated if minimum possible structure is demolished / dismantled. Pakistan Sports Board intends to substitute the roofing arrangement but on existing structure elements viz. columns and beams etc. In new arrangements, solution to the problems being faced should be solved on permanent basis. Design-cum-construction arrangements can also be considered.

2.     Interesting firms are requested to submit their expression of interest but after physical inspection at site. These firms will prepare design for substitute roofing arrangement in a way that main objects of existing roofing arrangements are not destroyed. Further details cab be obtained if required, from given address and telephone number. The scope of work includes:

a. Study of existing roofing arrangement
b. Feasibility for substitute roofing system
c. Submitting proposal for substitute arrangement
d. Procedure for implementation of new roofing arrangement.
e. Cost of substitute roofing arrangements including period for execution of      assignment.

3.     The interesting Firm/Consultants/Contractors, who have completed the works, similar in nature are requested to submit following information alongwith application so as to reach the Pakistan Sports Board, Kashmir Highway , Islamabad not later than 10th December 2007:-

a.

Name, Address, Telephone & Fax Nos of Firm

b.   

Date of establishment of the firm.

c.   

Registration with PCATP/PEC or other bodies.

d.   

Details of works already completed with the name of client, executing agency, job values and time of completion alongwith the completion certificate from client or consultants.

e.   

Details of works in hand with all information as in (d) above

f.   

Bio-data of key personal/Engineering Staff available full time with the firm.

g.  

Details of plants, machinery etc.

h. 

List with photocopies of enlistment with any private, semi Government and Government Organizations.

i. 

List of cases of arbitration / litigation into by the Firm, if any.

j.  

Certificate regarding financial stability

k.  

Designing Fee. %

l.  

Supervision Fee. %

4.     The Director General, Pakistan Sports Board, Islamabad, reserves the right to accept or reject any or all the tenders without assigning any reason.


(Sabir Hussain Malik)
Assistant Engineer (Civil)
Pakistan Sports Board,
Kashmir Highway , Aabpara,
Islamabad
Ph: 051-9201521